Stoney Trail
101 km corridor · Up to 70,000 vehicles/day near Beddington Trail (north); lower volumes on newer southwest sections
About Stoney Trail
Stoney Trail (Highway 201) is Calgary’s 101-kilometre ring road freeway. The final southwest leg (Tsuut’ina Trail) opened in late 2023, completing the full loop around the city. The route connects all major radial highways and provides a bypass for through-traffic that would otherwise clog inner corridors like Deerfoot Trail and Crowchild Trail.
Current Activity on Stoney Trail
Key Intersections
Speed Limits
Peak Hours
Heaviest congestion at the Deerfoot Trail and 16 Avenue interchanges during rush hour. The southwest leg has reduced overall ring-road congestion since opening in 2023
Major Projects
Airport Trail / Stoney Trail Interchange Stage 2
Construction started August 2025, targeting completion October 2026. Enhances access to Calgary International Airport with improved ramps and capacity.
Stoney Trail at Shaganappi Trail Interchange Twinning
Building a second three-lane bridge alongside the existing one to provide three lanes in each direction, addressing growing northwest traffic volumes.